Project Description:
EEVH wishes to enlarge its hydroelectric capacity by uprating two existing
hydroelectric
power plants and building a new one at the Yura basin located
in the Tomave township in
the Potosí Department, Bolivia and by developing
two additional hydroelectric power
stations in the La Paz Department,
Bolivia; one in the South Yungas township and the
other one in the Pucarani
township. The projects in the Yura basin will be developed as
part of a
Joint Venture Agreement signed by EEVH with Corporación Minera de Bolivia
(COMIBOL).
The projects involved are the following:
Expansion of the Landara plant 1st and 2nd phases, at the Yura River basin,
1.05 MW.
New turbine at the Punutuma Plant, at the Yura River basin, 0.40 MW.
Condor Plant at the Yura River basin, 1.30 MW.
Chuñavi Hydroelectric Power Station, at the Tuni River basin, 1.20 MW
Anasani Hydroelectric Power Station, at the Anasani River basin, 3.40 MW.
Project lifetime:
21
years
Accreditation period:
21
years
Estimated Greenhouse Gas Emissions
Reductions:
Annual: 16,691 tCO2e
Up
to and including 2012: 112,265 tCO2e
Up
to a period of 7 years: 95,574 tCO2e
Up
to a period of 10 years: 145,647 tCO2e
Up
to a period of 14 years: 212,412 tCO2e
Up
to a period of 21 years: 350,511 tCO2e
Project Benefits:
Installed capacity increase with application of clean technologies.
No
Green House Gases (GHGs) emissions due to the run of the river plant type
concept (by
avoidance of new dams).
Erosion control and regulation of water flows for irrigation in the Yura
River in Potosí and
Tuni River in La Paz.
Total Project cost estimate:
Development costs: 0.6 US$ millions
Installed costs: 9.0 US$ millions
Total costs: 9.6 US$ millions
Current Status:
The project has a PIN and the Note of Interest.
Contact Information:
Empresa Eléctrica Valle Hermoso S.A.
Eng. Enrique Herrera
Executive President
Phone: +591-4-4286600
Fax: +591-4-4115195
Calle Tarija 1425, Cochabamba
eherrera@panamericansec.com.bo
/
Back
/
|