RIO TAQUESI HYDROELECTRIC POWER PROJECT    

 

SECTOR: ENERGY         

 

 

 

 

 

  General Description:

  The Rio Taquesi Hydroelectric Power system aims to prevent the emission of around 5

  million metric tons of GHG over its 35 years life, by displacing electricity that would be

  supplied to the Bolivian grid by fossil fuel power plants dispatched if the project would not

  be implemented. The Taquesi system pursues to produce electricity through the operation

  of 89.5 MW (in the aggregate) hydroelectric generating plants along the Taquesi and

  Unduavi rivers. The system consists of two hydroelectric plants in La Chojlla (around 38

  MW) and Yanacachi Norte (almost 52 MW), a 115 kV switch yard adjacent to ENDE’s

  existing substation in Pichu and around 5.2 km of double circuit 115 kV transmission line

  and 7.3 km of single circuit transmission line.

 

  Project lifetime:

  35 years

 

  Accreditation period:

  21 years

 

  Baseline and Monitoring Methodology:

  Approved consolidated baseline methodology reference number assigned by the CDM

  Executive Board: ACM002, version 06

 

  Estimated Greenhouse Gas Emissions Reductions:

  21 years: 3,096,282 tCO2e

  Up to and including 2012: 1.7 millions of tCO2e

  Up to a period of 10 years: 1.4 millions of tCO2e

  Up to a period of 14 years: 2.0 millions of tCO2e

 

  Main Project Benefits:

  The project improve quality of life

 

  Both temporary and permanent jobs were created during the construction and operation

  of the plants.

 

  The project provides financial incomes to government

 

  Project reduces GHG emissions and the use of fossil fuels

 

  Total implementation cost estimate:

  Development Costs: 7.8 US$ million

  Construction costs: 86.2 US$ million

  Other costs: 7.5 US$ million

  Total: 101.5 US$ million

 

  Current Status:

  The project is in commercial operation since June of 2002. It has a PIN, Note of Interest by

  the DNA, PDD done. Bolivian government issued the National Letter of Approval on 3/

  1/2007.

 

  Contact Information:

  Hidroeléctrica Boliviana S.A.

  Angel Zannier

  General Manager

  Phone: (591-2) 277 0765; fax: (591-2) 277 0933

  azannier@hidrobol.com

 

  Ricardo Michel

  Development and Commercial Manager