General Description:
The main objective of the project is the
electricity supply to the populations Guayaramerin,
Riberalta and
Cachuela Esperanza (Beni) by renewable hydro energy through the small
hydropower station in substitution the actual diesel generation
decreasing the cost per
kWH. The project will be implemented in three
phases, the first one of 500 kW, the second
one 2000 KW and the third
6000 kW. The project consists in a low head hydro scheme
with inflated
dams to regulate the water flow and level, especially in dry season,
using the
“cachuelas” (small waterfalls) to create a difference in the
river level, which is required for
the hydroenergy generation. The
hydroturbines to be implanted are: low head propeller
and synchronous
generators 380V/50Hz of frequency. The electrical line to consumption
center will be extended in a 30 km by 34.5 kV of voltage.
Project lifetime:
40 years.
Accreditation period:
21 years.
Estimated Greenhouse Gas Emissions
Reductions:
Up to and including 2012: 166,589 tCO2e
Up to a period of 7 years: 134,202 tCO2e
Up to a period of 10 years: 220,732 tCO2e
Up to a period of 14 years: 278,419
tCO2e
Up to a period of 21 years: 538,009
tCO2e
Project Benefits:
With the present project the energy price
payed at the moment by the consumer will be
reduced in a range of 31.81%
to 36.36%. With a cheaper energy, it will be possible to
encourage
industrial development.
More population will receive the benefits
of the use of the electricity.
Reduce the emissions of GHG due to the
use of diesel for generation’s purposes.
Total Project cost estimate:
1st Phase: 815,000 US$
2nd Phase: 1,545,000 US$
3rd Phase: 4,120,000 US$
Total: 6,480,000 US$
Current Status:
The project has a PIN and the Note of
interest.
Contact Information:
Carlos Danilo Espinoza
Calle Alfredo Rivas 1046, PO. Box 3270,
Cochabamba, Bolivia
Phone: +591-774-55710
Mobile: +591-711-46003
danilo_esp@hotmail.com
Andres Calizaya Terceros
andrecaly@hotmail.com
andrecal@entelnet.bo
/
Volver
/
|