CONVERSION OF EXISTING OPEN CYCLE GAS TURBINE TO COMBINED CYCLE OPERATION AT GUARACACHI POWER STATION, SANTA CRUZ, BOLIVIA

 

 

SECTOR: ENERGY

 

 

 

 

 
 

 

  General Description:

  The project activity will convert two General Electric 6FA gas turbines currently operating in

  open cycle mode to combined cycle operation at Guaracachi power station in Santa Cruz,

  Bolivia. This will involve the installation of two heat recovery steam generating boilers

  which utilize the waste heat from the gas turbine to raise steam. The steam will be used

  to generate electricity using an associated steam turbine; operating the 6FA gas turbines

  in combined cycle mode results in significant efficiency gains. This is the first project of this

  type in Bolivia.

 

  The two 6FA gas turbines have a combined installed capacity of 112 MW. The project will

  result in the installation of a further 80 MW of generating capacity. Therefore electricity will

  be generated more efficiently; less gas will be combusted per unit of electricity generates.

 

  Project lifetime:

  20 years.

 

  Accreditation period:

  10 years.

 

   Baseline and Monitoring Methodology:

  The CDM project proposed  is have been elaborated on the basis of the new baseline

  methodology: Open Cycle to combined cycle gas turbine conversion connected to an

  economically dispatched, centrally controlled grid. 

 

  Estimated Greenhouse Gases Emissions Reductions:

  Up to and including 2012: 2.27millions tCO2e

  Up to period of 10 years:: 3.4 millions tCO2e

 

  Project Benefits:

  This project contributes to enforce the National System..

 

  Better use will be made of the natural gas resources of Bolivia through the efficiency gains

  of the project.

 

  The proposed CCGT conversion is the first in Bolivia.

 

  The CCGT project will increase the skilled workforce required at the generating station. The

  CCGT will result in training of local workers.

 

  There is the potential for other CCGT conversion projects in Bolivia, the proposed project

  at Guaracachi will result in the transfer of technology and knowledge to Bolivia to help to

  facilitate of the efficiency improvement across the grid.

 

  Total Project cost estimate:

  Not available.

 

  Current status:

  The Project has a PDD, and a Approval letter in process.

 

  Contact Information:

  Sr. Mike Eyre

  Independent Power Corporation PLC

  Telephone: +44-0- 2077937676

  meyre@indpow.co.uk

 

  Lic. Marcelo Blanco Quintanilla

  Empresa Guaracachi

  Av. Brasil y Tercer Anillo Interno

  Santa Cruz, Bolivia

  Casilla 336

  Telephone: +591-3-3464632

  Fax: +591-3-3487274

  mblanco@egsa.com.bo